Technical requirements for simulation test of control system functions of the rural photovoltaic power station cluster (English Version)
The GB/T40616-2021 standard has established a complete control system simulation test technology system for village and town photovoltaic power station clusters connected to voltage levels of 10kV and below. The standard innovatively proposes a collaborative test method for the real-time simulation device and the communication simulation system, covering the 8 major functions of the monitoring master station and the 3 core function tests of the monitoring terminal.
Test dimensions | Monitoring master station requirements | Monitoring terminal requirements | Common indicators |
---|---|---|---|
Data acquisition accuracy | Telemetry error<1.5% | Telemetry error<1.5% | Optical fiber communication cycle≤3s |
Control response time | Reactive power control waveform matching | No delay in active power regulation instructions | Carrier communication cycle≤30s |
System performance indicators | Processor utilization <60% | Simulation step ≤50μs | Remote control accuracy 100% |
The test system specified in Appendix A of the standard adopts a four-layer architecture:
In the test of a 200kW village-level photovoltaic power station:
1. A three-phase programmable power supply is required to simulate grid disturbances
2. It is recommended to use RTDS real-time simulator to build the test environment
1. Focus on the 12 key indicators in the Appendix B Record Table
2. Communication simulation needs to cover three abnormal scenarios: disconnection, congestion, and redundancy
1. Include the waveform comparison chart as required by Appendix C
2. The calibration certificate number of the test instrument needs to be indicated