Technical standards for geotechnical engineering of tailings accumulation dams (English Version)
Survey category | Applicable scenarios | Key technical requirements |
---|---|---|
Survey during operation | When the dam height increment reaches 1/3~1/2 of the design value | Location of the infiltration line, analysis of the consolidation law of tailings |
Closure survey | When the final stacking height is reached | Hazard identification, feasibility assessment of reclamation |
Special survey | Adjustment of mining/monitoring system | Process adaptability analysis, optimization of sensor layout |
1. Seepage calculation and analysis: The effect of the effectiveness of drainage facilities on the infiltration line needs to be considered, and the selection of 2D/3D models depends on the dam grade (Engineering dam is mandatory for 3D analysis). The permeability coefficient needs to be determined through on-site pumping tests and indoor vertical/horizontal permeability tests.
2. Stability evaluation: The simplified Bishop method (safety factor ≥ 1.5) is combined with the strength reduction method. Under earthquake conditions, the 7-degree intensity area needs to be subjected to pseudo-static method and time history analysis, and the parameter selection refers to the CU/CD test results in Table 8.1.5.